Aerial Cooler as an Option

  • It may be feasible to warm up directly into a production pipeline (depending on host facility pipeline envelope)
  • The cooler duty is 2400 tonnes/d of 45% quality warm-up steam returns, nominal 100 GJ/h comprised from 2 @ 50% in this service.
  • Bluesteam provides innovative winterization using low-cost electric heaters in the plenum space.
  • It is feasible to remove one aerial cooler from service after the warmup phase., or even remove it in some cases.
  • BlueSteam can optimize the cooler specification to suit the owner’s needs.